To identify the main technical and economic indicators of flow are a summary table of the number of core workers and to determine the required technological equipment - a summary equipment.
A summary table of the number of core workers. Consider a pivot table for a flow of manufacturing men's demi-season coat (tab. 21).
The number of workers by occupations and level set selective way on the basis of the technological scheme; the proportion of workers in % is determined according to the total number of work flow.
The main technical and economic indicators determined in the following way.
The burden of making products taken from the flowsheet.
Basic wage per unit of product at a price determined by multiplying the daily rate of the 1st category to the sum of wage and dividing the resulting works on the issue of flow per shift.
The average discharge is equal to the sum of the digits divided by the estimated number of workers.
The average tariff rate tariff is equal to the sum of the coefficients divided by the estimated number of workers in the stream.
Output per worker (productivity) is determined by dividing the estimated release on the estimated number of workers in the stream.
The coefficient of mechanization of the flow is determined by dividing the amount of time mechanical work for the total time spent for the product.
On the basis of the technological scheme and the summary table of the number of main workers constitute the main technical and
economic indicators of the stream.
The main technical and economic indicators |
Time of production of goods, h |
4,1 |
Basic wage per unit of product, RUB-COP |
2 - 0,16 |
The average discharge |
3,84 |
The average tariff rate |
1,39 |
Output per worker (day), ed |
1,9 |
The coefficient of mechanization flow |
0,58 |
Summary of equipment. A summary of the equipment is on the basis of the technological scheme in the following form.
Summary of equipment flow
The type and class of the car, the manufacturer |
The amount of technological equipment |
Jobs |
|
Main |
Backup |
Just |
Name and their sizes, m |
The number |
|
|
|
|
|
|
The number of backup equipment is taken at an average rate of 10% of the total amount of equipment. In addition, backup equipment should be considered of sewing machine spare parts jobs, the number of which is determined during the planning of jobs.
|